Restoring the mires of the Australian Alps following the 2003 wildfires

Introduction

The number and area of mires (fens and bog) of the Australian Alps has declined dramatically over the past 150 years due to grazing by domestic stock, recreation activities, infrastructure development, increasing feral animal damage, and exotic weed invasion. In addition to this degradation, the 2003 wildfires burnt over almost all the alpine, subalpine and montane fens and bog, with a further loss of about 15% of the functional mires existing at the time.

Description

Following the 2003 wildfires approximately 70 large peat bog areas required restoration works to ensure that they recovered to a fully functional condition. The impacts of the fires varied and damage ranged from minor burning of some Sphagnum (moss) hummocks (mainly Sphagnum cristatum), to complete destruction of the bog and fen vegetative cover and partial burning of the underlying peatbeds. The latter resulted in the loss of the functional hydrological role of the peats and as a consequence, the loss of the ecosystem services the bogs and fens provide to catchment water storage, flow regulation and runoff filtering.

Project Aims

A program of restoration and revegetation of the mires was started in March 2003 and continues to be implemented by field staff of the individual national parks within the Alps National Parks Co-operative Management Agreement. The aim is restore and enhance the capacity of the damaged areas to recover their functional hydrological role, and regenerate a stable natural mire vegetation complex. Several mire recovery monitoring and research programs were also initiated immediately post-fire to both guide the restoration work and to quantify the benefits of the various restoration techniques and programs (Hope, et al. 2006). Photo monitoring points were established at all bog and fen restoration sites and several demonstration sites were also established to visually monitor the benefits of mire restoration and to act as ecological restoration education and interpretation sites.

Restoration Delivered

Restoration works were applied to approximately 130 individual bog and fen sites burnt by the fires – about one tenth of the total number of bogs and fens burnt over by the fires. Approximately 300 ha of bog and fen ecosystem has been restored to functional and stable mires, with large areas of adjacent organic soils and associated shrub and grassland ecosystems benefiting from the improved soil moisture regime accruing from the mire restoration works. All bogs and fens, to which restoration works have been applied have recovered from a desiccated state to a saturated state, although the full recovery of this condition has taken between 15 months and six years. Based on past experience, full recovery of the functional role of the ecosystem and a complete bog and fen vegetation complex will still take many years to achieve.

Site Activity

There are two main tenets for this ecological restoration work: one is that peat bog should recover their capacity to take up surface and subsurface flows so they regain their saturated state, and the other is the need for the recovery and restoration of a natural shade cover to provide for widespread recovery of mire plants particularly that of Sphagnum spp. regeneration. The techniques used for the restoration of bog and fen ecosystems involved shading and protection of the remnant bog and fen plant populations, particularly Sphagnum species from high ultra-violet light levels and desiccation by covering the Sphagnum hummocks with shade cloth; the construction of straw-bale ‘dams’ in flowlines to create/restore surface pools; the construction of subsurface organic matter dams to slow the flow of water from the peats; and the placement of coir and straw-filled jute mesh ‘logs’ as surface water-spreaders and sediment traps.

{"zoom":7,"lat":-36.5342467,"lon":145.5231824,"markers":{"0":{"lat":-36.775742361,"lon":148.198353335}}}

Project Name: Restoring the mires of the Australian Alps following the 2003 wildfires

Organisation / Lead partner: Australian Alps national parks

Predominately: Upland

    Image of machinery being used on a peatland to restore the habitat
    Natural Resources Wales announces new funding for peatland restorationA new restoration fund, managed by Natural Resources Wales (NRW), was launched this week in an…
    The IUCN UK Peatland Programme team at the base of Kinder Scout
    Reflecting on 2024: a busy year for peatlandsAs the year draws to a close, the IUCN UK Peatland Programme looks back on 2024.
    Four people in outdoor clothing looking out across a peatland landscape. Image credit: Mark Reed
    Help answer the question: Do investors undervalue the social impact of peatland projects in the UK when making investment decisions?Business professionals at the Cambridge Institute for Sustainability Leadership are seeking…
    Photograph of Cornwall Sustainability Awards on a table with a screen in the background
    Big Win for Cornwall’s Peatlands at Local Sustainability AwardsThe South West Peatland Partnership (SWPP) has been recognised at the 2024 Cornwall Sustainability…
    Aerial image of hagging on a damaged blanket bog landscape. Image credit: Mark Brown
    Technical review of remote sensing for UK peatlandsThe IUCN UK Peatland Programme has commissioned a technical review of the potential and…
    Salmon leaping out of the water. Image credit Stephen Barlow
    New species showcase - Atlantic salmonThe latest in our series of species showcases celebrates the Atlantic salmon and the role that…
    Exterior view of Virtual Peatland Pavilion showing four large domes in an urban landscape
    New Virtual Peatland Pavilion launched for COP29To raise awareness of the global importance of peatlands during COP29, the latest pavilion has been…
    Cover image for 'The most important plant in the world' showing the film's title in yellow text over a background of Sphagnum moss
    Specially commissioned film celebrates 'The most important plant in the world'The IUCN UK Peatland Programme has commissioned the first in a series of short films, celebrating…
    Cumbrian tarn - large body of water with emergent vegetation and hills in the distance. Image credit Steve Hewert.
    Launch of the Peatland Code Version 2.1The IUCN UK Peatland Programme has launched a new update to the Peatland Code, which helps to boost…
    Flat peatland landscape on fire with large plumes of smoke. Image credit Paul Turner
    New brief highlights the importance of peatland rewetting for wildfire resilienceThe IUCN UK Peatland Programme's latest publication explores recent evidence from the UK and North…
    Painting of a river in spate: Peter Graham 1866, 'A spate in the highlands'
    Call for proposals for Water Research Seminar SeriesThe IUCN UK Peatland Programme and the Environment Agency are delighted to announce a series of…
    'Work in progress' sign with a digger on it next to two photographs of children drawing on large sheets of paper
    The Power of the Peat Bogs! How pupils turned their environmental education into a song Primary school pupils who have engaged with a project to restore ancient peatland and traditional…