New Forest LIFE III Wetlands Project

Introduction

The objectives of the New Forest LIFE III Wetland Restoration project was to:

  • Restore the priority interest features of the New Forest SAC and their supporting adjacent habitats in accordance with the SAC Management Plan
  • Establish their long term sustainability through the development of a mechanism that ensures the integrated management of the main water basins
  • Creation of suitable conditions for the regeneration of a significant further area of priority habitat.

Description

The New Forest is the largest site (14,800 ha) in western Europe where heathland, grassland, mire and pasture woodland habitats survive together in what is a functioning ecosystem based on a continuing practice of pastoralism.

They occur as part of a network of wetland habitats that are totally dependent on their local hydrological systems. This complex mosaic of wildlife habitats was formerly common in lowland Western Europe, but is now rare and fragmented.

The unusual combination is maintained largely by the presence of commoners' grazing ponies and cattle. European dry heat gives way to Northern Atlantic wet heath on the poorly drained soil, which often fringe the valley mrires and include a range of different plant communities such as depressions on peat substrates of the Rhyncosporion, alkaline fens and transition mires.

Restoration Delivered

The project restored a total of:

  • 261 ha of riverine woodland
  • 18 ha of bog woodland
  • 141 ha of wet grassland
  • 184 ha of valley mire
  • 10 km of river

Peatland restoration techniques included stabilisation, grip blocking, vegetation removal and rewetting.

Site Activity

The practical works of the LIFE3 project targeted three of the six main water basins of the New Forest cSAC: Lymington River; Avon Water and Hampshire Avon.

These three water basins contain the greatest proportions of riverine woodland and bog woodland within the cSAC. They each highlight different restoration issues because they overlay different geomorphologies and bring different sets of partners to the table to discuss mechanisms for delivery.

The actions restored the hydrology of the priority habitats and adjacent wetland habitats to re-establish the links between habitats currently restricted by fragmented land use patterns.

Actions to prepare for this work included geomorphological, topographical and hydrological surveys.

Water Basin Management Forum developes the detail of the work completed by the LIFE3 project team by proposing consultations with a wide range of partners whilst acting as a mechanism to deliver an integrated holistic and strategic approach to the management of the cSAC’s water basins at every level.

Practical actions include the use of the innovative technique developed as part of the LIFE 2 project for mire restoration and a technique that reinstates debris dams to restore natural river channel features.

Other actions ncluded the removal of invasive species, the establishment of a coppicing regime and installing protective fencing from deer to aid the establishment of new colonies.

Public awareness was targeted to support the project, and progress and performance monitoring
of the project was completed. 

Partners

Six partner organisations were organised in delivering the project:

  1. English Nature (now Natural England)
  2. Environment Agency
  3. Forestry Commission
  4. Hampshire County Council
  5. National Trust
  6. RSPB
{"zoom":12,"lat":50.8765244,"lon":-1.6314631,"markers":{"0":{"lat":50.8765244,"lon":-1.6314631}}}

Project Name: New Forest LIFE III Wetlands Project

Organisation / Lead partner: Natural England

Location: New Forest, Hampshire

Approximate area covered: 184 ha

Conservation Status: Site of Special Scientific Interest (SSSI), Special Area of Conservation (SAC), Special Protection Area (SPA), National Park (NP)

Predominately: Lowland

Peat Habitats: Lowland raised bog, Lowland heath

Project Type: Management, Research

Year Project Began: 2002

Project End Date: 2006

Useful Downloads:

    Image of machinery being used on a peatland to restore the habitat
    Natural Resources Wales announces new funding for peatland restorationA new restoration fund, managed by Natural Resources Wales (NRW), was launched this week in an…
    The IUCN UK Peatland Programme team at the base of Kinder Scout
    Reflecting on 2024: a busy year for peatlandsAs the year draws to a close, the IUCN UK Peatland Programme looks back on 2024.
    Four people in outdoor clothing looking out across a peatland landscape. Image credit: Mark Reed
    Help answer the question: Do investors undervalue the social impact of peatland projects in the UK when making investment decisions?Business professionals at the Cambridge Institute for Sustainability Leadership are seeking…
    Photograph of Cornwall Sustainability Awards on a table with a screen in the background
    Big Win for Cornwall’s Peatlands at Local Sustainability AwardsThe South West Peatland Partnership (SWPP) has been recognised at the 2024 Cornwall Sustainability…
    Aerial image of hagging on a damaged blanket bog landscape. Image credit: Mark Brown
    Technical review of remote sensing for UK peatlandsThe IUCN UK Peatland Programme has commissioned a technical review of the potential and…
    Salmon leaping out of the water. Image credit Stephen Barlow
    New species showcase - Atlantic salmonThe latest in our series of species showcases celebrates the Atlantic salmon and the role that…
    Exterior view of Virtual Peatland Pavilion showing four large domes in an urban landscape
    New Virtual Peatland Pavilion launched for COP29To raise awareness of the global importance of peatlands during COP29, the latest pavilion has been…
    Cover image for 'The most important plant in the world' showing the film's title in yellow text over a background of Sphagnum moss
    Specially commissioned film celebrates 'The most important plant in the world'The IUCN UK Peatland Programme has commissioned the first in a series of short films, celebrating…
    Cumbrian tarn - large body of water with emergent vegetation and hills in the distance. Image credit Steve Hewert.
    Launch of the Peatland Code Version 2.1The IUCN UK Peatland Programme has launched a new update to the Peatland Code, which helps to boost…
    Flat peatland landscape on fire with large plumes of smoke. Image credit Paul Turner
    New brief highlights the importance of peatland rewetting for wildfire resilienceThe IUCN UK Peatland Programme's latest publication explores recent evidence from the UK and North…
    Painting of a river in spate: Peter Graham 1866, 'A spate in the highlands'
    Call for proposals for Water Research Seminar SeriesThe IUCN UK Peatland Programme and the Environment Agency are delighted to announce a series of…
    'Work in progress' sign with a digger on it next to two photographs of children drawing on large sheets of paper
    The Power of the Peat Bogs! How pupils turned their environmental education into a song Primary school pupils who have engaged with a project to restore ancient peatland and traditional…